How a Solubius renovation is planned and carried out

Planned first, then done in order.

Every Solubius project follows the same order. You send photos and a short brief, we visit, and the scope is agreed in writing before work starts. The work then runs in sequence. Repairs come first, joinery next and decoration last. Each room is checked before the house is handed back.

A Solubius tradesman reading plans in a Victorian house under renovation while two others hang a door and skim a wall

Five steps

  1. Step 01

    Get in touch

    Tell us what you need and send photos.

  2. Step 02

    We take a closer look

    We inspect the space and explain the best way forward.

  3. Step 03

    Plan and prepare

    Scope agreed, materials organised, the house protected.

  4. Step 04

    Careful work

    Carried out in the agreed order, the site kept tidy.

  5. Step 05

    Final check

    Room by room, then the house handed back ready to use.

What you can expect

  • Clear communication

    Straightforward advice and clear expectations from start to finish.

  • Proper preparation

    Surfaces, materials and details put right before anything is finished.

  • Respect for the property

    Work areas protected and kept tidy, as we would expect in our own home.

Questions about the process

On site

Protection comes first

Before any dusty or wet work, floors are covered, doors and windows wrapped and every edge masked. This is what that looks like on a real job.

  1. Film 01

    A living room sheeted floor to ceiling before spraying.

  2. Film 02

    Doorways and skirting masked, floors covered wall to wall.

  3. Film 03

    Hall and stairs protected while the work goes on.